Budhanilkantha 4-Aana Residence · Shrestha Family (Kathmandu / Sydney)
Lead Engineer: Er. Dipesh Adhikari (NEC Reg. Civil) · Next check: Roof waterproofing & electrical conduit test
Give diaspora and local homeowners one verified link for milestone status, NBC 105 material checks, payment tranches, and dated site-engineer logs — no more scattered Viber photos.
5-stage structural and finishing tracker synced from site engineer updates.
Completed Jul 2026 · Tranche 1 · Paid (15% weight)
Completed Aug 2026 · Tranche 2 · Paid (20% weight)
Completed Oct 2026 · Tranche 3 · Paid (25% weight)
In progress · Target Dec 2026 · Tranche 4 · Scheduled (20% weight)
Target Feb 2027 · Final Tranche · On handover (20% weight)
Quality checks signed off before concrete pours and finishing.
Fe500D TMT Rebar · Mill test verified
M25 Ready-Mix · 28-day cube test passed
NBC 105:2020 ductile detailing inspected
Crystalline terrace & sunken slab coat
Completed 9-inch exterior wall masonry on east/south faces and ran 48-hour CPVC water pressure test with zero drop.
Logged by Er. Dipesh Adhikari
14-day ponding cure completed. Cube crush report recorded 29.4 MPa (above M25 target).
Logged by Er. Dipesh Adhikari
Verified stirrup spacing and lap zones per NBC 105 structural drawings before pouring.
Logged by Er. Dipesh Adhikari
Tranche 1 · Paid · 15% weight
Tranche 2 · Paid · 20% weight
Tranche 3 · Paid · 25% weight
Tranche 4 · Scheduled · 20% weight
Final Tranche · On handover · 20% weight
Publish a dated field update that appears immediately on the Homeowner / NRI View.
Budhanilkantha 4-Aana Residence is a fictional project. Milestone changes and inspection logs sync in your current browser session across this portal and the Kora Buildworks demo.