One live site-progress portal for NRI families & Kathmandu builders.

Give diaspora and local homeowners one verified link for milestone status, NBC 105 material checks, payment tranches, and dated site-engineer logs — no more scattered Viber photos.

Overall Completion 70%
Current Stage Brickwork, Plumbing & Electrical Conduits
Inspection Logs 3
Active Tranche Tranche 4 · Scheduled

Budhanilkantha 4-Aana Residence · Shrestha Family (Kathmandu / Sydney)

Lead Engineer: Er. Dipesh Adhikari (NEC Reg. Civil) · Next check: Roof waterproofing & electrical conduit test

70% complete

Construction Milestones & Payment Tranches

5-stage structural and finishing tracker synced from site engineer updates.

  • Soil Test, Municipal Naksa & Excavation

    Completed Jul 2026 · Tranche 1 · Paid (15% weight)

    Completed
  • Foundation, Tie-Beams & Plinth DPC

    Completed Aug 2026 · Tranche 2 · Paid (20% weight)

    Completed
  • RCC Columns, Beams & Floor Slabs (2.5F)

    Completed Oct 2026 · Tranche 3 · Paid (25% weight)

    Completed
  • Brickwork, Plumbing & Electrical Conduits

    In progress · Target Dec 2026 · Tranche 4 · Scheduled (20% weight)

    In progress
  • Waterproofing, Glazing, Finishes & Handover

    Target Feb 2027 · Final Tranche · On handover (20% weight)

    Upcoming

Verified Material & Seismic Checklist

Quality checks signed off before concrete pours and finishing.

  • Structural Steel

    Fe500D TMT Rebar · Mill test verified

    Verified
  • Concrete Mix

    M25 Ready-Mix · 28-day cube test passed

    Verified
  • Seismic Standard

    NBC 105:2020 ductile detailing inspected

    Verified
  • Waterproofing

    Crystalline terrace & sunken slab coat

    Verified

Dated Site Inspection Log

Chronological engineering sign-offs visible to family members in Kathmandu and abroad.

  • First-floor brickwork & plumbing pressure check passed LOG-03 · 2026-11-18

    Completed 9-inch exterior wall masonry on east/south faces and ran 48-hour CPVC water pressure test with zero drop.

    Logged by Er. Dipesh Adhikari

  • Second-floor slab curing & de-shuttering complete LOG-02 · 2026-10-29

    14-day ponding cure completed. Cube crush report recorded 29.4 MPa (above M25 target).

    Logged by Er. Dipesh Adhikari

  • Ground floor column rebar inspection signed off LOG-01 · 2026-09-14

    Verified stirrup spacing and lap zones per NBC 105 structural drawings before pouring.

    Logged by Er. Dipesh Adhikari

Budhanilkantha 4-Aana Residence is a fictional project. Milestone changes and inspection logs sync in your current browser session across this portal and the Kora Buildworks demo.